Preview

Land Reclamation

Advanced search

Test Data of “AUG-3” Aggregate for Mainte-nance of Waterworks

Abstract

Presented: Engineering performance data of aggregate prototype model to perform package of works for maintenance (whitewashing and painting of waterworks; lifting and lowering of flood gates-regulators; hydroseeding of grasses; formation of holes in toes for staking during consolidation of soil reclamation canals; mouth cleaning of drains and trays; cleaning of drain pits; washing of works before painting) and the main results of acceptance test. Positive results, achieved during test, allow launching “AUG-3” aggregate for production.

About the Authors

V. N. Kondratyev
RUE "Institute for Land Reclamation"
Belarus


N. G. Raikevich
RUE "Institute for Land Reclamation"
Belarus


V. N. Pekur
RUE "Institute for Land Reclamation"
Belarus


N. N. Prokopovich
RUE "Institute for Land Reclamation"
Belarus


References

1. Протокол №162 Д 1/1-2008 от 10 декабря 2008 г. приемочных испытаний агрегата для ухода за гидротехническими сооружениями (пос. Привольный). - 2008. - 61 с

2. Руководство по эксплуатации АУГ-3 00.00.000 РЭ. - Минск, 2007. - 49 с

3. Агрегат для ухода за гидротехническими сооружениями АУГ-3 (Технические условия ТУ BY 100363825.012-2009). - Минск, 2009. - 12 с


Review

For citations:


Kondratyev V.N., Raikevich N.G., Pekur V.N., Prokopovich N.N. Test Data of “AUG-3” Aggregate for Mainte-nance of Waterworks. Land Reclamation. 2009;(2):88-93. (In Russ.)

Views: 191


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2070-4828 (Print)